Belt conveyor installation standard

2019-09-04

Avant-garde machinery takes you to see the belt conveyor installation standards on seed melon production line


1. When the bottom plate at the head and tail of the belt conveyor is soft, the cement foundation with a length of 2m, a width of 1.5m and a depth of 1m is fixed. The bottom bolt (φ 20mm) is embedded in the cement foundation not less than 700mm. When the bottom plate at the head and tail is hard, the ground anchor shall be used for fixing (the anchoring force shall not be less than 50KN), and the anchor bolts (φ 20mm) shall be cast in cement and buried in the bottom plate at least 1400mm.


2, the installation of belt conveyor must be head, tail fixed firmly, smooth operation. The bottom belt shall not be less than 400mm from the bottom plate, and the lowest point of the tail drum shall not be less than 150mm from the bottom plate. Installation test run to flat, straight, stable, nose, fuselage, tail center in a straight line.


Seed melon production line


3. The head and tail must be set up to prevent personnel from contacting the driving drum and the guiding drum, and the coal unloading bin mouth should be equipped with an iron grate (the interval size is 250mm×250mm).


4, the installation of belt conveyor must have enough safety clearance, belt conveyor and lane support distance shall not be less than 0.5m; The distance between the head and tail of belt conveyor and roadway side support shall not be less than 0.7m.


5, the head frame, tail frame and tension device, protection device shall not have welding, deformation phenomenon, fixed bolt fastening, thread should be exposed 1-3 wire, the adjustment allowance of tension device is not less than 1/5 of the adjustment of the whole stroke. The middle frame is straight without opening welding, the hanging rope (the upper hanging width should be larger than the lower width), the frame is complete, fixed and reliable, without serious corrosion.


6, the wire rope hanging adopts double 8 wire, the lower end of the hanging point is located in the long roller frame, the upper end is fixed on the roof fixed point, the double wire is evenly stressed, the wire rope head is tightly wrapped.


7, roller complete, flexible rotation, no jam phenomenon. The distance between triple roller and long roller is 1.5m, the distance between long roller and long roller is 3m, the distance between anti-deviation roller and bottom roller is 15m, the minimum distance between bottom roller and bottom roller shall not be less than 200mm.


8, belt conveyor lap length is not less than 0.5m. The inclination Angle of the belt machine should not be greater than 18 degrees when it is used to transport coal upward, and the inclination Angle of the belt machine should not be greater than 15 degrees when it is used to transport coal downward.


9, skid, coal pile, speed, smoke, overtemperature, deviation, emergency stop, tear, sprinkler, anti reverse tape protection device should be complete, sensitive, signal device should be sound and light, clear and reliable; When two or more belt conveyors are running online, the interlocking device should be sensitive and reliable. Skid protection is installed on the non-sidewalk side of the active roller with leather head; Deviation protection is installed on the belt hanger, 25m away from the leather head; Pile coal protection installed on the belt head; The emergency stop protection is installed at the top of the beam 30m away from the skin head; The tearing belt protection is installed at the bottom of the belt 30m away from the leather head; The overtemperature protection is installed on the gearbox; The smoke protection is installed directly above the leather head. The sprinkler dust control device is arranged at the nose transfer point, the nozzle is 0.5m away from the nose belt, and the control valve is arranged in the convenient opening position, 1.5m away from the bottom plate height.


10. The motor, gearbox and coupling are firmly fixed and connected, and the protective cover is complete and reliable. The drum is not broken and the key is not loose.


11. There is no breakage in the tape, the transverse crack shall not exceed 5% of the bandwidth, and the width of the damaged surface of the intermediate fiber layer shall not exceed 20% of the bandwidth. The joint clamp is firm and smooth. In operation, the belt does not slip or run off track, the upper and lower belt does not exceed the edge of the roller and the idler, and the lower belt does not grind the frame.

189-1498-5258

Address: 1508, No.9, Lane 231, Greenland Avenue, Huaqiao International Business City, Kunshan

No.10, Fufu Third Road, Anfeng Electronic Information Industrial Park, Dongtai, Jiangsu

Website: www.ymeco-tech.com


WeChat scan